Don't Look Up! We got you!
Sunday, November 8, 2026 · UTC
Launch Updates

NASA's new Artemis plan: a 2027 test in Earth orbit, then a 2028 Moon landing

Artemis III becomes a two-week docking rehearsal close to Earth; Artemis IV lands at the South Pole in 2028, with NASA waiting to choose between SpaceX and Blue Origin.

Launch & Spaceflight Correspondent
Share on X
Stands on 16 placed sources from 7 publishers.
NASA prepares for Moon landing with new Artemis plan
NASA prepares for Moon landing with new Artemis plan AI illustrationhow this picture was made
WASHINGTON, USA, Oct. 23, 2026 - NASA laid out a revised Artemis plan on 23 October.[1] The first crewed Moon landing since Apollo is now Artemis IV, targeted for 2028,[2][3] at the lunar South Pole,[4] and NASA will delay choosing between SpaceX and Blue Origin as the lander provider for as long as possible.[5][6] Before then, Artemis III becomes a test flight close to home. It is planned for summer 2027[7] as a two-week mission[8] in low Earth orbit,[9] where the crew will rehearse docking the Orion spacecraft with lunar landers.[10] Administrator Jared Isaacman said it will test docking with both companies' landers.[11] The crew will dock with Blue Origin's Blue Moon for two days[12] but will not enter SpaceX's Starship.[13] The crew is Randy Bresnik, Andre Douglas, Frank Rubio and Luca Parmitano.[14] Uncrewed landing test flights are required before any crewed landing,[15] and NASA will then pick either SpaceX or Blue Origin to carry the first Artemis IV crew.[16] Impact Insight. Landing people on the Moon again rebuilds the heavy-lift, deep-space navigation and crew-survival skills that any mission beyond low Earth orbit needs. The link to planetary defense is indirect: the same rockets and operations could one day help study or deflect a hazardous asteroid.
Proof16 sources · 7 publishers · signed
What this stands on
  1. NASA provided an Artemis program update on 2026-10-23. · spacepolicyonline.com
  2. NASA Administrator Jared Isaacman stated the agency is targeting return of American astronauts to the lunar surface in 2028. · NASAUnited Statesofficial source ·
  3. NASA plans astronaut Moon landings for 2028. · spacepolicyonline.com
  4. The lunar South Pole is the planned Artemis landing site. · spacepolicyonline.com
  5. NASA will delay selection between SpaceX and Blue Origin for the Artemis IV lunar lander for as long as possible. · Phys.org
  6. NASA has not selected either SpaceX or Blue Origin as the landing provider for the Artemis IV crewed lunar landing. · Payload
  7. Artemis III is planned for summer 2027 launch. · mynews13.com
  8. Artemis III mission will last two weeks. · mynews13.com
  9. Artemis III will be a low-Earth orbit mission. · mynews13.com
  10. NASA redesigned the Artemis III mission earlier this year as a crewed flight in Earth orbit to rehearse docking the Orion spacecraft with lunar landers built by SpaceX and Blue Origin. · Mashable
  11. NASA Administrator Jared Isaacman stated on Friday that Artemis III will launch next summer to conduct orbital docking tests with both SpaceX and Blue Origin lunar landers. · fortune.comUnited States
  12. Artemis III crew will dock with Blue Moon lander for two days. · mynews13.com
  13. Artemis III crew will not enter SpaceX Starship during the mission. · mynews13.com
  14. Artemis III crew includes Randy Bresnik, Andre Douglas, Frank Rubio, Luca Parmitano. · mynews13.com
  15. Uncrewed landing system test flights are required before crewed missions. · spacepolicyonline.com
  16. NASA will select either SpaceX or Blue Origin as the lander provider for the Artemis IV crewed lunar landing mission scheduled for 2028. · fortune.comUnited States
The 2 we could place publish from United States. 5 could not be placed by their address. 1 is an official body, so this traces to the document itself.